Central Information Commission CIC/AD/C/2008/000409 Dated April 12, 2010 Name of the Applicant : Shri Amar Nath Name of the Public Authority : DRM Office Northern Railway, Ambala Cantt Background
1. The Applicant filed his RTI application dt.27.11.07 with the PIO, DRM Office, NorthernÂ
Railway, Ambala Cantt seeking information against 5 points relating to Railway PlansÂ
No.70ÂMisc/1946  DLI  and  No.MÂ287  R1/BT1Â1955  The  PIO  replied  on  4.12.07  andÂ
dissatisfied with the reply, the Applicant filed a complaint dt.18.1.08 before CIC. The thenÂ
Information  Commissioner,  Shri  O.P.Kejriwal  vide  his  Order  dt.29.9.08  remanded  theÂ
case back to the Appellate Authority. The Appellate Authority replied on 3.11.08 informingÂ
the Applicant that copies of plans cannot be provided as they are very old (1946) and notÂ
in a condition to be copied . He furnished the remaining information. Not satisfied, theÂ
Applicant then filed a complaint dt.19.11.08 before CIC stating that Respondents had notÂ
provided the plans of the sites.
2. The Bench of Mrs. Annapurna Dixit, Information Commissioner, scheduled the hearingÂ
for April 12, 2010. Â
3. Shri T.R.Sharsar, PIO; Shri Sunil Verma, Ch.OS representing the Appellate Authority’;Â
Shri  Neeraj  Bhandari,  Sr.DEN/II  and  Shri  Jai  Prakash,  Jr.  Engineer  represented  theÂ
Public Authority.
4. The Applicant was not present during the hearing
Decision
5. The Respondents produced before the Commission  the 3 original site plan prepared inÂ
1946, which  were indeed not  in a condition to be copied.  He added that the ApplicantÂ
had been requested vide letter dt.3.1.08 of the Appellate Authority  to visit the office andÂ
inspect the plans or if he wishes to have the copy of the drawing, the same may beÂ
collected  after depositing  Rs.16,924/ for the 3 plans
6. The Commission after hearing the submission of the Respondent  directs the Appellant toÂ
either visit the office on a mutually convenient day  to see the plans of the sites  to satisfyÂ
himself   and/or   deposit  the  amount  as  sought  by  the  Respondent  to  reproduce  theÂ
drawings  if he requires.  The Respondent may on receipt of this Order send a break upÂ
of the amount Rs.16,924/ to the AppellantÂ
7. The appeal is accordingly disposed of.
 (Annapurna Dixit)
Information Commissioner
Authenticated true copy:
(G.Subramanian)
Deputy. Registrar
Cc:
1. Shri Amar Nath
H.No.33159Â
St. No.01, Partap Nagar
Bathinda 151 005
Punjab
2. The PIO
Northern Railway
Divisional Railway Manager’s Office
Ambala Division
Ambala Cantt
3. Officer incharge, NIC
4. Press E Group, CIC